Description
Eminěre II Phase is a residential development in an established residential area of Cuarte de Huerva, offering homes with Passivhaus certification. This property provides 204 m² of usable area on a 1000 m² plot, with five bedrooms and three bathrooms. Arranged over two floors, the house includes a porch, private garden and a garage for two cars with an installation for an electric-vehicle charging socket.
The main floor includes one bedroom. The master bedroom has an en-suite bathroom, dressing room and a large private terrace. The property also offers three complete bathrooms with shower screens and designer vanity units, including the en-suite bathroom serving the master bedroom. Large storage areas, fitted wardrobes and a storage room provide additional practicality.
The open-plan kitchen is fitted with high-quality furniture and appliances. It has a separate laundry room and direct access to a welcoming enclosed terrace, designed for enjoying summer evenings.
The house is equipped with aerothermal air conditioning, underfloor heating and a heat-recovery system. The Passivhaus standard also supports a comfortable and energy-efficient indoor environment:
- stable temperatures throughout the year
- high energy savings
- air filtration to remove dust, pollen and other allergens
- optimal orientation to maximise sunlight
Eminěre includes more than 1000 m² of communal areas with a large swimming pool, landscaped spaces and outdoor furniture. Home automation can also be installed, including motorised blinds with remote control and additional control mechanisms for the home’s systems, operated from the same controller or a mobile device.
The development is located close to Lidl and Mercadona supermarkets, both five minutes away on foot. Ánfora International School and Roman Forum are within a ten-minute walk. The property is a few minutes from the centre of Cuarte de Huerva, with access to the motorway and a bus stop providing connections to both Cuarte de Huerva and Zaragoza. Construction has already begun, with completion scheduled for the third quarter of 2026.







